Pipe Feeder

Modular Continuous Pipe Feeding System for HDD and Tunnelling Pipeline Installation

Get in touch

The UNI-PF250 enables uninterrupted pipe movement throughout the entire HDD and Tunnelling installation — from start to finish, without a single stop.

Uninterrupted pipe movement

The conveyor system feeds the pipe continuously — maintaining constant axial motion throughout installation.

No static friction peaks

Steady movement keeps friction forces predictable and controlled, reducing load variation on the pipe and borehole.

Reduced pipe sticking risk

Continuous feed significantly lowers the risk of pipe becoming stuck inside the borehole — protecting project timelines.

Full installation control

Precise control of pipe position, feed speed and bore pressure throughout the process.

 Each module delivers up to 250 tons of continuous axial thrust force. Multiple modules can be combined to reach 500, 750 or 1000 tons — scaled to your project requirements

Scalable Thrust — Any Project Size

The UNI-PF250’s patented modular architecture is the core of its flexibility. Start with one module — add more as your project demands.

 1 Module

250T – Standard crossings

Single-unit operation. Fast mobilization. Covers the majority of large-diameter HDD and Tunneling pipeline crossings.

2 Modules

500T – Demanding Crossings

Two modules share one power pack. Combined continuous thrust for long-distance or complex bore conditions.

3+ Modules

750T+ – Ultra-demanding shore approach & offshore

Unlimited scalability. Multiple modules in sequence — the system grows with the challenge.