
TERRA HC600 C+
60 t / 600 kN rod system for controlled renewal across a broad pipe range.

Approved HC600 C+ and X1000 rod systems for demanding trenchless replacement projects.

Cable Bursting
A pulling cable is installed through the existing service before the bursting head and new pipe are drawn through. Compact systems suit lateral and smaller-diameter renewal work.
Rod Bursting
Rigid rods are assembled through the existing line to transfer higher controlled pulling force. The method supports larger pipes and demanding renewal projects.

60 t / 600 kN rod system for controlled renewal across a broad pipe range.

100 t / 1000 kN rod system for large-diameter and demanding renewal work.
Confirm material, diameter, route length, access pits, ground, service constraints and the proposed new pipe before selecting the system.
TA Drilling can help review the approved TERRA system, tooling and pull arrangement.